Need help using the council agenda and meeting system? Please click here.

    Browser plugins and popup blockers may interfere with the operation of this website. Please disable them if you are experiencing difficulties.

File #: O17-756    Version: 1 Name:
Type: Report Status: Passed
File created: 10/31/2017 In control: Township Council
On agenda: 11/6/2017 Final action: 11/6/2017
Title: Development Permit Application No. 100890 (161884 Canada Inc. / Beedie Development Group / 4825 - 275 Street) Report 17-114 File CD 14-05-0098
Attachments: 1. B.1 11_06 cd DP Beedie 4825 - 275 St
title
Development Permit Application No. 100890
(161884 Canada Inc. / Beedie Development Group / 4825 - 275 Street)
Report 17-114
File CD 14-05-0098
recommended action
That Council authorize issuance of Development Permit No. 100890 to 161884 Canada Inc. for property located at 4825 - 275 Street, subject to the following conditions:

a. Building plans being in compliance with Schedules "A" through "C"'
b. Landscape plans being in substantial compliance with Schedule "E" and in compliance with the Township's Street Tree and Boulevard Planting Policy to the acceptance of the Township;
c. All signage being in compliance with Schedules "C" and "D" and the Gloucester Development Permit Guidelines and the Township's Sign Bylaw;
d. Provision of a final tree management plan incorporating tree retention, replacement and protection details in compliance with the Township's Subdivision and Development Servicing Bylaw (Schedule I - Tree Protection), to the acceptance of the Township;
e. Rooftop mechanical equipment to be located so that it is not visible from adjacent roads or alternatively screened from view by compatible architectural treatments;
f. All outdoor storage areas being covered by a dust free surface;
g. All refuse areas to be located in an enclosure and screened to the acceptance of the Township;
h. All chain link fences being black vinyl with black posts and rails; and
i. Section 702A.5(a) - Siting of Buildings and Structures of the Township of Langley Zoning Bylaw 1987 No. 2500 being varied to reduce the minimum setback for a principal building from a front lot line in General Industrial Zone M-2A from 10 m (32.8 ft) to 5 m (16.4 ft).

Although not part of the Development Permit requirements, the applicant is advised that prior to issuance of a building permit the following items will need to be finalized:

a. Payment of supplemental Development Permit application fees and Building Permit administration fees.
b. Submission of a site specific on-site servici...

Click here for full text