Need help using the council agenda and meeting system? Please click here.

    Browser plugins and popup blockers may interfere with the operation of this website. Please disable them if you are experiencing difficulties.

File #: O19-2094    Version: 1 Name:
Type: Report Status: Passed
File created: 3/4/2019 In control: Township Council
On agenda: 3/11/2019 Final action: 3/11/2019
Title: Development Permit Application No. 100994 (Integrated Construction / 5762 - 268 Street) Report 19-31 File CD 14-07-0051
Attachments: 1. B.1 cd Integrated Construction 5762 268 St.pdf
Title
Development Permit Application No. 100994
(Integrated Construction / 5762 - 268 Street)
Report 19-31
File CD 14-07-0051
Recommended Action
That Council authorize issuance of Development Permit No. 100994 to 0827532 BC Ltd. for property located at 5762 - 268 Street, subject to the following conditions:

a. Building plans being in compliance with Schedules "A" through "D";
b. Landscape plans being in substantial compliance with
Schedules "B" and "E" and in compliance with the Township's Street Tree and Boulevard Planting Policy to the acceptance of the Township;
c. Provision of a final tree management plan incorporating tree retention, replacement and protection details in compliance with the Township's Subdivision and Development Servicing Bylaw
(Schedule I - Tree Protection), to the acceptance of the Township;
d. All signage being in compliance with Schedule "C" through "D" and the Township's Sign Bylaw;
e. Rooftop mechanical equipment to be screened from view by compatible architectural treatments in compliance with Schedules "A" through "D";
f. All refuse areas to be located in an enclosure and screened to the acceptance of the Township;
g. All outdoor storage areas being covered by a dust free surface;
h. All chain link fences being black vinyl with black posts and rails; and
i. Section 111.3 of the Township of Langley Zoning Bylaw No. 2500 being varied from a minimum 3.0 metre in depth landscaping area along the rear and interior side lot line in an industrial zone to permit a 1.54 metre in depth landscaping area as shown in Schedule "E".

Although not part of the Development Permit requirements, the applicant is advised that prior to issuance of a building permit the following items will need to be finalized:

a. Payment of supplemental Development Permit application fees;
b. Provision of an exterior lighting impact plan prepared by an electrical engineer in compliance with the provisions of the Township's Exterior Lighting Impact Policy to the ac...

Click here for full text